Office/Tenant Improvement


office-tenant-improvement-projects

Bon Secours Fit-out- Roberta Glinton Medical Office Building (MOB)– Port Jervis, NY (2012) Estimator Prepared an estimate for a tenant buildout of an outpatient medical suite.

Bon Secours—Repair Skywalk Ceiling –  Port Jervis, NY (2012) Estimator Due to Hurricane Sandy, an estimate was prepared to repair the exterior ceiling of a Skywalk over a main road that connected the Hospital to the MOB.

Bon Secours Hospital Staff Lounge and Office Renovation –  Port Jervis, NY (2012) As Project Manager estimated and managed upgrades to administrative offices and a staff lounge.

Citifinancial at Waterford Park Suite 121 Tenant Buildout – Orlando, FL (2006) EstimatorIn a recently built strip mall with dirt floors, a proposal was put together for a $101,000, 1,500 SF fitout for Citifinancial.  The scope of work was adding a bathroom, building demising walls, rooftop AHU, pouring a new slab and all finishes.  Tenant was to furnish this open space layout with cubicle desks.

Lady Lake Village Crossroads– Lady Lake, FL (2006) – Estimator For a national commercial property developer, The Benchmark Group, Mr. Collier compiled an estimate for a core and shell shopping center containing nationwide anchor tenants.

Renovation of Park Place at Metrowest– Orlando, FL (2006) –  Estimator At the office complex of a prominent Orlando developer, Park Place Development, a negotiated bid was complied.  This consisted of an upgrade to the building exterior as well as an addition of a drive thru porte-cochere.  Many renditions were done to meet the budget, but an agreeable price and scope was not able to be met.

Office Parking Garage in Metrowest– Orlando, FL (2006) – Estimator For a repeat potential developer, prepared an estimate for a parking garage structure designed using a castellated steel beam structure to reduce the overall weight of the superstructure.

CORE Construction – Orlando Office Buildout Suite 111– Orlando, FL (2005) –  Project Manager As CORE Construction was growing their presence in Central Florida, there was a need to expand the office operations.  Mr. Collier successfully managed the buildout of class A space and performed transition planning so the move with all personnel and equipment was done with no loss of business.

Offices at Veranda Park Tenant Fit-out Bundle – Orlando, FL (2004) – Assistant Project Manager In the emerging Metrowest area, a high end office complex was developed within a mixed use section called Veranda Park.  Multiple office fit-outs were awarded simultaneously as the core and shell contractor was finishing the building.  On a weekly basis, Mr. Collier would visit the job site to track the schedule and assist the on-site superintendent.

Salomon Smith Barney – Orlando, FL (2004) – Assistant Estimator  On a high end tenant fit-out, Mr. Collier assisted the Project Manager with a $500,000 negotiated proposal.

Downtown Orlando – Various Commercial High-rise Office Fit-outs  – Orlando, FL (2004) For prominent property managers’ Jones Lang LaSalle, Trammel Crow and Highwoods Properties, Mr. Collier participated in competitive – negotiated bidding against other tenant improvement contractors.  In addition to the plans and specs, the contractor was also responsible for a site walk thru to account for discrepancies on drawings as well as match the building standard materials.

Various fit-outs Maitland Office Center  – Maitland, FL (2004) Assistant Project Manager Assisted the project manager and superintendent with various tasks including scheduling, contract administration and quality control for multiple tenant improvement projects in the same office complex.

Bank of America – Executive Office’s Renovation – Orlando, FL (2004) Assistant Project Manager  / Superintendent Located on the upper floors of the landmark Bank of America Center Skyscraper a renovation of the executive office and meeting rooms was performed in an occupied work space.  Swing spaces were created and extensive temporary protection measures were required to do a project of this scope during normal business hours of an occupied workspace.

Gainesville Police Department – Storage Renovations – Gainesville, FL (2004) Assistant Estimator Assisted Senior Project Manager compile a public bid for a renovation of a storage unit within a police department.